Check the box Is Discontinuation Date on the Attributes tab in the Variable Update window of a Project Variable with a Date Variable Type. The Is Discontinuation Date field will only display if there is no other variable already marked as the discontinuation date and the variable type is a Date.
Set the Required status of the Discontinuation Date to No