Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Overview

For most research projects, the first encounter is considered the baseline assessment. However, some projects include a run-in period or screening, thus the Baseline checkbox is used to indicate which interval is considered Baseline.  The baseline interval is used as a basis for calculating time from study onset.

Required Role(s)

  •  Project Management

Steps

Attributes tab

  1. Enter a name for the interval
  2. The Active box is checked by default indicating the interval is active
  3. Check the box for Baseline
  4. Enter an After Target Range

    The After Target Range value determines the Latest projected date for data entry

  5. Select the units from the drop down box

 
 
 
Variable Groups tab
 

  1. Mark the checkbox in the Include column for the variable groups that will be collected at this interval
  2. Mark the checkbox in the Entered By Subject column for variable groups that will be entered by the subject

    This column is only displayed in projects with Subject Login enabled

 Interval Expression tab

  1. Enter a dependency that is specific to this interval
  2. Enter a dependency that goes across variable groups

    Dependencies that are specific to a variable group are entered on the Dependencies tab of the Variable Group Update page


  • No labels