...
- Enter a name for the interval
- The Active box is checked by default indicating the interval is active
- The Fixed Interval box is checked by default
- Enter the Target Length which is the time between the interval designated as baseline and this interval
- Select the units for the target length from the drop down box
- Enter the Before Target Range and After Target Range
Info The Before and After Target Range values determine the Earliest and Latest projected dates for data entry
- Select the units from the drop down box for the before and after target range
Variable Groups tab
- Mark the checkbox in the Include column for the variable groups that will be collected at this interval
- Mark the checkbox in the Entered By Subject column for variable groups that will be entered by the subject
Info This column is only displayed in projects with Subject Login enabled
...