Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Enter a name for the interval
  2. The Active box is checked by default indicating the interval is active
  3. The Fixed Interval box must be checked for a screening interval
  4. Enter the Target Length which must be set to a negative value (to indicate that screening occurs prior to baseline)
  5. Select the units for the target length from the drop down box for the target length
  6. Enter the Before Target Range and After Target Range
    Info

    The Before and After Target Range values determine the Earliest and Latest projected dates for data entry

  7. Select the units from the drop down box for the before and after target range

  
 
 
Variable Groups tab
 

  1. Mark the checkbox in the Include column for the variable groups that will be collected at this interval
  2. Mark the checkbox in the Entered By Subject column for variable groups that will be entered by the subject
    Info

    This column is only displayed in projects with Subject Login enabled

...