Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Enter a name for the interval
  2. The Active box is checked by default indicating the interval is active
  3. The Fixed Interval box is checked by default 
  4. Enter the Target Length which is the time between the interval designated as baseline and this interval
  5. Select the units for the target length from the drop down box
  6. Enter the Before Target Range and After Target Range
    Info

    The Before and After Target Range values determine the Earliest and Latest projected dates for data entry

  7. Select the units from the drop down box

...