Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Enter a name for the interval
  2. The Active box is checked by default indicating the interval is active
  3. Check the box for Baseline
  4. Enter an The Fixed Interval box is checked by default 
  5. Enter the Target Length which is the time between the interval designated as baseline and this interval
  6. Enter the Before Target Range and After Target Range
    Info

    The Before and After Target Range value determines values determine the Earliest and Latest projected date dates for data entry

  7. Select the units from the drop down box

...